Copyright © 2025 O6 ENVIRONMENTAL SERVICES. ALL RIGHTS RESERVED.

Navigating Manufactured Gas Plant (MGP) Site Remediation Costs & Timelines

Manufactured Gas Plant (MGP) sites are among the most challenging remediation projects due to their complex contamination profiles and regulatory scrutiny. These legacy industrial sites, once used to produce gas from coal or oil, often contain hazardous byproducts such as coal tar, polycyclic aromatic hydrocarbons (PAHs), and volatile organic compounds (VOCs). Left untreated, these contaminants can impact soil, groundwater, and even air quality. At O6 Environmental, we help public and private sector clients navigate MGP remediation efficiently and compliantly.

What Affects the Cost of MGP Remediation?

MGP remediation costs can vary significantly depending on several critical factors:

  • The size and history of the site, including how many years it was operational.
  • The type, concentration, and depth of contaminants present in soil and groundwater.
  • Site accessibility and proximity to sensitive receptors like schools or water sources.
  • Regulatory oversight level and permitting complexity.
  • Remediation technology selected—excavation, thermal treatment, or in-situ stabilization.
  • Volume of waste requiring off-site disposal and associated transport logistics.

Typical Remediation Timeline

Remediation projects at MGP sites typically span 12 to 36 months, from site investigation to final closure. The timeline can be influenced by:

  • Initial site characterization and sampling campaigns.
  • Design and approval of the remediation work plan by regulatory agencies.
  • Seasonal construction windows and weather conditions.
  • Material handling and waste disposal coordination.
  • Post-remediation monitoring and reporting cycles.

O6 Environmental’s Turnkey MGP Solutions

With decades of experience in MGP cleanup, O6 Environmental manages projects from start to finish. Our team provides full-service support including subsurface investigation, risk assessments, remedial design, implementation, and post-closure documentation. We tailor each project to site-specific conditions, stakeholder needs, and compliance standards to deliver cost-effective and transparent solutions.

Why This Matters

Untreated MGP sites can pose ongoing risks to public health, property value, and the environment. Engaging a qualified remediation partner early allows for better planning, accurate budgeting, and long-term success.

Let’s Get Started

If you’re managing an MGP site, O6 Environmental is ready to help you navigate the complexity with confidence. Contact us today to schedule a site evaluation.

Categories

Archives

Want to SHARE this?