SIPC contracted O6 ENV to provide project management, field resources, labor, and equipment to remove impacted soil removal at their Power Plant in Marion, IL.

O6 ENV utilized heavy equipment to remove over 15,000 cubic yards of contaminated material from an existing coal ash pond. This material was staged onsite for dewatering and T&D at a later date.

O6 ENV transported over 15,000 cubic yards of clay material from an onsite borrow source to bring the pond back to the design grades. The pond was compacted in lifts to 95%.

O6 ENV subcontracted GSI to install the 60mil HDPE geomembrane. 6 pipe penetrations were needed to keep drainage on their site functional. An anchor trench was dug and backfilled around the perimeter to keep the liner in place. No material was placed on the liner since they will be using this pond for rainwater events.

Latest News

Severe weather risk planning

Emergency Response

Preparing Industrial Facilities for Severe Weather: Environmental Risk Planning Before the Next Storm

Severe storms, flooding, high winds, and other weather events can create environmental risks for industrial ...

Read Article
High pressure water jet cleaning industrial facility

Industrial Compliance

Hydroblasting for Industrial Maintenance: What Facilities Should Consider Before Cleaning

Industrial equipment can develop scale, deposits, process residues, and other buildup that interferes with inspection ...

Read Article

Tell Us Your Challenge. We’re Here to Assist.

"*" indicates required fields

Name
Subscribe to our email newsletter