WESTON contracted O6 ENV to provide project management, field resources, material and equipment to install geosythetic treatment cell with an HDPE leachate colletion systme 17th Street Remediation Project in Murphysboro, IL.

O6 ENV teamed with ERM to remediate and cap a former railroad Right of Way Murphysboro, IL. All remedial activities took place in high density residential district near an active City Museum. O6 ENV had to perform the remediation activities in an active surface water drainage area.

Approximately 2,000 tons of impacted soil was relocated to the specified elevations with a D5 dozer to pre-determined grades to create new drainage swales and allow for the installation of a bentomat liner system.

The liner system was backfilled with 3 feet of impermeable clay provided by a local source. The borrow material was transported by tandem truck, placed with a dozer, and compacted to the specified levels. A parking lot was also installed for the City Museum. A 6” layer of topsoil was spread and the area was hydroseeded to complete final restoration. The project was completed on budget and ahead of schedule.

Latest News

Company News

O6 Environmental at MGP Conference 2024: Connect with Us at Booth #19

O6 Environmental is excited to participate in the MGP Conference 2024, happening at the Hyatt ...

Read Article
Environmental trade Fair and Conference

Company News

Visit O6 Environmental at TCEQ Conference: May 14th-15th

May 5th, 2024 We’re excited to announce that O6 Environmental will be participating in the ...

Read Article

Tell Us Your Challenge. We’re Here to Assist.

"*" indicates required fields