Project Name

WCERT Treatment Cell Construction

Client

WESTON

Location

West Chicago, IL

WESTON contracted O6 ENV to provide project management, field resources, material and equipment to install geosythetic treatment cell with an HDPE leachate colletion systme 17th Street Remediation Project in Murphysboro, IL.

O6 ENV teamed with ERM to remediate and cap a former railroad Right of Way Murphysboro, IL. All remedial activities took place in high density residential district near an active City Museum. O6 ENV had to perform the remediation activities in an active surface water drainage area.

Approximately 2,000 tons of impacted soil was relocated to the specified elevations with a D5 dozer to pre-determined grades to create new drainage swales and allow for the installation of a bentomat liner system.

The liner system was backfilled with 3 feet of impermeable clay provided by a local source. The borrow material was transported by tandem truck, placed with a dozer, and compacted to the specified levels. A parking lot was also installed for the City Museum. A 6” layer of topsoil was spread and the area was hydroseeded to complete final restoration. The project was completed on budget and ahead of schedule.

Latest News

Company News, Environmental Remediation

O6 Environmental’s Groundwater Remediation Services: Protecting Missouri’s Water Resources

Groundwater is a vital resource for communities, agriculture, and industries across the Midwest, particularly in ...

Read Article

Company News, Environmental Remediation

The Importance of Regulatory Compliance in Environmental Services: How We Ensure Adherence to Standards

At O6 Environmental, regulatory compliance is the cornerstone of our operations. With over 20 years ...

Read Article

Tell Us Your Challenge. We’re Here to Assist.

"*" indicates required fields